Projects
Our Past Projects Include:
|
Client
|
Job
|
|
Shell Oil Products Wilmington, CA
|
DCU Coker Heater Revamp Project, IPF improvements Project and M1005 Wet Gas Compressor Replacement Project. Pre-turnaround
and Turnaround.
|
|
Shell Oil Products Wilmington, CA
|
Installation of new Sumitomo Electric Air blown fiber optics system from the Inline Blender to the RP&S control room
and the CTF tank areas.
|
|
Shell Oil Products Wilmington, CA
|
New work agreement in place for maintenance and capital project improvements.
|
|
BP Four Corners Pipeline Long Beach, CA
|
Electrical/ Instrumentation for BP Shoreside at Pumps at Berth 121 Pier T in Long Beach Harbor.
|
|
BP Products Company Carson, CA
|
Electrical/ Instrumentation for Truck Loading System and Conveyor System at the BP Blue Barn Coke Storage building.
|
|
Valero Refining Products Company Wilmington, CA
|
Electrical/ Instrumentation for the Capital Project Flue Gas Cooler and Deaerator Replacement Project.
|
|
Chevron Refinery El Segundo, CA
|
Electrical Instrumentation for the West Basin Municipal Water District Boiler Feed Water Onsite Improvement project.
|
|
Paramount Petroleum
|
New 7.5 Megawatt Co-Gen station
|
|
Ultramar Refinery Wilmington, CA
|
Ultramar 2001 Replacement Project. FCCU, Precipitator, Flue Gas Cooler (T/A)
|
The following are background references
of major past projects. They show a consistent high level of capability along with a wide range of work capabilities.
HONEYWELL TDC-3000 System Support
ARCO Los Angeles Refinery
Provided all levels of assistance to HONEYWELL in assembling, installing, moving and modifying new/existing TDC-3000
consoles, universal stations, engineering consoles, process managers (PN4) and LCN cabinet. Installed fiber optic patch panels,
fiber optic cable and data cable. Also, provided installation of TRIAD instrumentation grounding for isolation of TDC equipment.
Completed TDC equipment includes NACCR (North Area Central Control Room) and SACCR (South Area Central Control Room),
as well as other major control rooms throughout the refinery. Mounted fiber optic data concentrator and battery back-up unit
at bottom of fiber optic backbone patch panel cabinet. Ran two new 120 VAC circuits. Connected fiber optic jumpers.
Assisted in moving two new TDC-3000 universal stations into positions
at the S&H control room and the gasoline blender.
North Area Central Control Room - DCS Equipment
Installation
Texaco, Wilmington Refinery
Installation of new HONEYWELL TDC equipment for a central control
room. Installation included control equipment for the central control room consisting of multiple clustered control consoles,
dozens of relocated emergency shutdown switches and various monitoring and alarm systems. Project also included a distributed
and redundant ABF fiber optic communication system. Cutover of process and shutdown systems performed on-line.
Install Air Blown Fiber Optic Backbone
System
Equilon, Wilmington Refinery
Install
refinery wide fiber optic backbone system utilizing the Sumitomo Air Blown Fiber system in accordance with manufacturers installation
procedures and practices.
OCSD Rehabilitation of Digesters I, J, K,
L, M, N and O
Huntington Beach,
CA
Furnish and install fiber optic
conduit system and fiber optic junction boxes.
Queensway Bay Harbor
Lighthouse Project
Long Beach,
CA
Install all electrical and lighting
for new lighthouse. Provide lighthouse beacon and fixtures.
Boeing Sea Launch Project
Los Angeles Harbor
Install and checkout analyzer system
ARCO/Cherne/Project
Management Team Polypropylene Project
ARCO Refinery, Wilmington, CA
10,000 manhour instrumentation, heat tracing, analyzer and project
support. #1 Polypropylene Unit and LRU.
1 County Sanitation Districts of Los Angeles County,
Whittier, CA
Electrical
for SJCE interceptor MOV feeder
2 TOSCO Refining Company, Wilmington, CA
Loading pumphouse electrical upgrades project.
EXXON Southwest Grease Business
Rancho Dominquez, CA
Electrical
and Instrumentation for the Hot Oil Furnace Project.
APCI Hydrogen/Steam I & E Project
Equilon Refinery, Wilmington, CA.
Installation, conduit, wiring, tubing, calibration and loop check. Operating
unit which included critical and tedious control room wiring obstacles successfully achieved without process interruption.
Project located in the Los Angeles Refinery and the off site Sulfur Plant. Critical path project completed on schedule.
SCADA System I & E
Huntway Refinery, Wilmington, CA.
Install pipeline SCADA panel, components, instruments, conduit, wiring
and tubing. Calibration, Loop check and PLC program logic check. Work was performed in conjunction with Mangan Inc. on a turnkey
basis. Hot cutover and critical time frame. Completed on schedule.
Flare
Monitoring Systems I & E
Equilon Refinery, Wilmington, CA.
Cenco Refinery, Santa Fe Springs, CA.
Flare monitoring analyzers. Installation of Panametrics ultrasonic
flowmeter and Texas Sampling gas sampler for flare monitoring. Install conduit, wire, tubing, calibration and loop check.
Hot cutover and critical time frame. Completed on schedule.
Anheuser-Busch, Inc.
Los Angeles Brewery
Various projects - Instrumentation installation, troubleshooting , calibration and support.
LAR, Sulfur Plant Conversion
ARCO, Carson Refinery
Purchase all bulk materials. Conversion of operating unit controlled
by pneumatics to TDC 3000 control system. Install all conduit, wiring, tubing and instruments to provide timely hot conversion.
Install Emergency Shutdown system and associated instruments, conduit, wiring and tubing. Loop check of all systems prior
to hot cutover. Conversion completed with no process upsets and an impeccable safety record.
FCC
revamp and turnaround
Ultramar Refinery, Wilmington
Installation of new instrumentation and associated conduit and wiring for new controls added/replaced in the FCC.
Calibration, installation, loop check and start up assistance. Instrumentation support for maintenance items. CSI supplied
the instrument bulk materials.
|
|
Prior to shutting down the FCC Spectra took pictures
of all installations to be removed in order to have clear records for reinstallation.
|
|
|
|
Fire Damage Rebuild Project
Lonza, Inc., Huntington Park, California
The reactor structure consists of twenty-three pre-fab modules erected
at the jobsite. We were responsible to provide a complete operating system including completion of the Reactor Building Instrumentation
System (PLC) with calibration and installation of instruments. We supplied the instrument bulk materials and loop check of
all instrument loops.
LAP, Install Air Blown Fiber Optic System
Equilon, Wilmington Refinery
Install tube cables, fiber distribution boxes and fiber optic cables
throughout the Los Angeles Plant per Sumitomo Future Flex Air Blown Fiber recommended procedures.
Truck
Rack Tank Farm Control Upgrade
ARCO, Vinvalle Loading Facility
Modernization and expansion of tank farm / truck rack controls, with the installation of new process instrumentation
and the replacement of several obsolete controllers with new programmable logic controllers. Replacements were performed either
on-line or in constricted outage periods.
NACR DCS Equipment Installation
Texaco, Wilmington Refinery
Installation of HONEYWELL
TDC operating stations in a new central control room, with relocation of operating personnel from several local control rooms.
Installation includes all control equipment for the central control room, consisting of multiple clustered control consoles,
dozens of relocated emergency shutdown switches and various monitoring and alarm systems, and all required communication,
power and grounding raceway and cabling. Project also will install a distributed and redundant fiber optic communication system
through half of the plant. Cutover of process and shutdown systems will be performed on-line. Work is being performed in conjunction
with Mangan Inc. on a turnkey EPC contract basis.
Subaru Research and Design
Laboratory Analytical System Revisions
Replacement
of temporary analytical sample system tubing with thirty-five new stainless steel tubing lines from bottleracks to new Horiba
analyzer.
CARB Analytical System
ARCO, Los Angeles Refinery
Installation of dozens of process analyzers and automated sampling systems
for on-line reformulated fuels analysis. Installation included multiple plant locations, assorted programmable logic controllers
and data concentrators, a refinery wide fiber optic data acquisition system and communication connection to the plant DCS
and LAN.
Mass Spectrometer
Unocal Finley Washington Ammonia Plant
Complete design and fabrication of a Mass Spectrometer panel with
related analyzers, sample systems and miscellaneous instrumentation.
Instrumentation
Support
ARCO Los Angeles Refinery
Calibration
and maintenance of alarms and verification to TDC CONTROL ROOM on the ISCO, SIU, #3 sour water oxidizers #2 Coker, # I Crude,
#51 VAC, #4 Crude, # I Cooling Tower, Treaters, SFIA, 12/12-a Cooling Towers, #3 REF/UDEX during major turnaround.
Crude and Stove Treaters
ARCO Los Angeles Refinery
Calibration of alarms and maintenance of stove treaters and desalters.
CEMS Analyzers
ARCO Los Angeles Refinery
Installation of three (3) CEMS (Continuous Emissions Monitoring System) analyzers
in two (2) 52 Vacuum Units and one (1) #1 Coker.
Rack Room PM Cabinet Installation
ARCO Los Angeles Refinery
Installation of HONEYWELL
PM cabinets and F/O cable from Rack Room to NACCR.
Fluid Catalytic Cracking Unit
ARCO Los Angeles Refinery
Installation of continuous
emissions-rate monitor analyzer systems for FCCU precipitators.
HCU Shutdowns
ARCO Los Angeles
Refinery
Modernization and conversion of existing
hydro-cracker, hydrogen and jet hydro-treater unit shutdown and interlock control systems, from Simplex relay-based to triple-redundant,
programmable logic control. Fabrication of test panels for triple-redundant system. Installation of all panels, instruments,
loop-checks, and commissioning.
HONEYWELL TDC-3000 System Support
ARCO Los Angeles Refinery
Has provided all levels
of assistance to HONEYWELL in assembling, installing, moving and modifying new/existing TDC-3000 consoles, universal stations,
engineering consoles, process managers (PN4) and LCN cabinet. Installed fiber optic patch panels, fiber optic cable and data
cable. Also, provided installation of TRIAD instrumentation grounding for isolation of TDC equipment.
Completed
TDC equipment includes NACCR (North Area Central Control Room) and SACCR (South Area Central Control Room), as well as other
major control rooms throughout the refinery. Mounted fiber optic data concentrator and battery back-up unit at bottom of fiber
optic backbone patch panel cabinet. Ran two new 120 VAC circuits. Connected fiber optic jumpers.
Assisted in moving two new TDC-3000 universal stations into positions at the S&H control room and the gasoline
blender.
Refinery-Wide CEMS
ARCO Los Angeles Refinery
Development of a redundant,
refinery-wide data acquisition installation from numerous, continuous emission monitoring cabinets to TDC LCN'S, history
modules and the Refinery DECNet. Installation of remote, programmable logic controllers, centralized data concentrators, gateways
and history modules, with all accompanying configuration and programming.
Tank
52 SPPL MOV Additions
ARCO Los Angeles Refinery
Installation of new PLC-based remote controls for twenty (20) (8 new and 12 existing) motor-operated valves. Included
multiple remote controllers, installation of a data highway, routing through most of the Tank Farm, and the onsite testing
and conversion of the existing controls.
Coker Burn Replacement
ARCO
Los Angeles Refinery
Participation in the reconstruction
team responsible for the replacement of damaged electrical and instrument installation. Included round-the-clock coverage,
testing and commissioning.
FCCU Conversion to TDC
ARCO
Los Angeles Refinery
Converted pneumatic to electronic
controls by means of TDC-3000 and on-line transfer. Installation of all instruments and process tubing. Performed loop-check
and commissioning.
Shell
LAR Refinery - DCU Fire Repair
Repair and replacement
of conduit, wire, instruments and equipment systems related to the DCU fire of March 2003.
- Initial Post Fire Assessment Of Damage
- Development of scope of work for repair.
- 24/7 coverage
and support for installation repair.
- Assist with commissioning
and start up of unit.
Chevron El Segundo Refinery 6H2S Regeneration
Project- 8/06-4/07
Installation of all onsite underground
and above grade electrical and instrumentation systems including loop check and start up for the new Hydrogen Sulfide Regeneration
Unit.
Paramount Petroleum Refinery
Clean Fuels Units Installation
- Installation of Clean Fuel Units (Naptha and Reformate Splitters, Isom Unit, Benzate)
- Delta V Control System.
- Field bus instrumentation system.
- 12.5 kv - 4160v
Substation.
- 4160v - 480v Substation.
- Pre-fabricated MCC and control building.
- Fiber optic network.
- Commissioning and startup of
units assisting Emerson Controls and UOP.
- PLC Upgrades To Reformate
Heater Unit
- Delta V conventional
I/O.
- Tie in to existing controls.
- Commissioning and start up of unit including new and existing controls.
- Micon
Control System.
- Rosemont instrumentation.
- Commissioning and start up of unit including new and existing controls.
- Installation of Blender Skid
- Tie existing tank controls to a new Delta V control system.
- Install blender skid controls, analyzer cabinets and fiber optic network.
- Assist skid vendor with commissioning and start up of blender.
THUMS Long Beach
Full
automation with field design and build in conjunction with Mangan Engineering or Islands Grissom, White, Freeman, Chaffee
and Pier J Locations.
- Included In Automation
Project
- Siemans PCS 7 Control System.
- Rosemont instrumentation.
- PLC motor controls.
- Mod-Bus well controller
system.
- Profibus D/P communications system.
- Industrial Ethernet (fiber optic/copper) network.
Shell
LAR Refinery - DCU Upgrades
Pre-turnaround / Turnaround
work for DCU Heater 101 Revamp Project / IPF Improvement Project / M1005 Wet Gas Compressor Project.
- Automatic De-heading System for four (4) coke drums
- MOV controls
- Rosemont
Instrumentation.
- TDC 3000 control system.
- IPF (Instrument Protective Function) upgrades.
- Installation of CEMS analyzer probes and control panels.
- Rosemont
Instrumentation.
- Lighting.
- M-1005 Wet Gas Compressor
- High voltage motor cable re-feed.
- New motor control devices and instrumentation.
- Re-wire
motor control panel.